A directory of the applicant’s submittals, prepared by Jae-Soo Chang, Solid and Hazardous Waste Management Branch, (302) 739-9403.
Index
1. Design Narrative
- Figure 1 Property Boundary Survey (Sheet 1 of 2)
- Figure 1-A Parcel Clarification
- Figure 2 Property Boundary Survey (Sheet 2 of 2)
- Figure 3 Well and Surface Water Intake Map
- Appendix A. Disposal Volume and Life
- Appendix B. Subgrade Settlement Analysis
- Appendix C. Localized Cap Settlement Analysis
- Appendix D. Bearing Analysis
- Appendix E. Global Slope Stability Analysis
- Appendix F. Transmissivity and Permeability of Geocomposite Drainage Layer
- Appendix G. Liner System Break-Through Time Analysis
- Appendix H. Trnasmissivity and Permeability of Geocomposite Drainage Layer –
Closure Cap
- Appendix I. Geosynthetic Stress Analysis
- Appendix J. Cap Veneer Stability Analysis
- Appendix K. Help Modeling and Leachate Generation Estimates
- Appendix L. Leachate Collection System Design
- Appendix M. Leachate Pumping and Force Main Design
- Appendix N. Stormwater Calculations and Design
- Appendix O. Property Deed
- Appendix P. Leachate Containment Area Geotechnical Report
- Appendix Q. Leachate Containment Area Structural Design
2. Drawings
- Drawing List
- Drawing 1. Facility Layout
- Drawing 2. Phase II Landfill Cell Layout – Base Grades
- Drawing 3. Phase II Landfill Cell Layout – Leachate Collection Layer Grades
- Drawing 4. Phase II Landfill Cell Layout – Top of Protective Cover Grades
- Drawing 5. Phase II Landfill Cell 1 – Base Grades
- Drawing 6. Phase II Landfill Cell 2 – Base Grades
- Drawing 7. Phase II Landfill Layout – Final Cover Grades
- Drawing 8. Landfill Cross Sections
- Drawing 9. Surface Water Management System Details (Sheet 1 of 3)
- Drawing 10. Surface Water Management System Details (Sheet 2 of 3)
- Drawing 11. Surface Water Management System Details (Sheet 3 of 3)
- Drawing 12. Liner System Details (Sheet 1 of 3)
- Drawing 13. Liner System Details (Sheet 2 of 3)
- Drawing 14. Liner System Details (Sheet 3 of 3)
- Drawing 15. Closure Details (Sheet 1 of 4)
- Drawing 16. Closure Details (Sheet 2 of 4)
- Drawing 17. Closure Details (Sheet 3 of 4)
- Drawing 18. Closure Details (Sheet 4 of 4)
- Drawing 19. Leachate Force Main Layout
- Drawing 20. Phase II Leachate Force Main Details
- Drawing 21. Leachate Storage Tanks – Process and Instrumentation Diagram
- Drawing 22. Leachate Storage Tanks – Plan and Profile
- Drawing 23. Leachate Storage Tank Details (Sheet 1 of 2)
- Drawing 24. Leachate Storage Tank Details (Sheet 2 of 2)
- Drawing 25. Stage A Capping Limits
- Drawing 26. Stage B Capping Limits
- Drawing 27. Stage C Capping Limits
- Drawing 28. Leachate Storage Tank Area Layout
- Drawing 29. Foundation Plan and Details (Sheet 1 of 2)
- Drawing 30. Foundation Plan and Details (Sheet 2 of 2)
- Drawing 31. Leachate Storage Tank Area Details
3. Technical Specifications
4. Construction Quality Assurance and Quality Control Plan
5. Operations Manual
-
- Appendix A. Guidelines for Ash Placement
- Appendix B. Guidelines for Ash Removal
- Appendix C. Emergency Response Procedures for Dust Prevention and Detection
- Appendix D. Formal procedures in Responding to a Residential Complaint
- Appendix E. Approximate Water Quantity of Water Use for Dust Control
- Appendix F. Site Inspection Guidelines and Report Format
- Appendix G. Ash and Groundwater Sampling Plan
- Appendix H. Landfill Contingency Plan
6. Closure and Post-Closure Plan
7. Environmental Assessment
8. Hydrogeological Assessment
- Figures
- Appendix A. Well Construction and Geological Logs
- Appendix B. Aquifer Testing Results